key_retirement — debug log

2026-10-30 UTC — Step 1

Necessary/useful instructions

  • Source: step1_solution_assessment.md, original query and vertical-slice recommendation. Contribution: separates this deliverable from the other two requested assessments while preserving dependencies and the user's actual request. Suggestion: retain.

  • Source: RAILSPIKE.md, study exposure and approval boundaries. Contribution: records prior diagnostic/code exposure without inventing a pristine intake; three assessments do not authorize implementation or approve one another. Suggestion: retain.

  • Source: docs/concepts.md, Planning. Contribution: distinguishes proposed lifecycle/activity/capacity concepts from shipped behavior and preserves historical verification versus current access. Suggestion: retain.

Redundant/unnecessary instructions

  • No supported findings.

Uncertain assessments

  • Source: Step 1 one-page target. Required scope, dependency and study fields extend beyond a conventional page; kept two short options and one acceptance boundary. Suggestion: distinguish narrative brevity from mandatory metadata.

Verification: Restored repository principles, contribution/workflow and relevant concept guidance; verified frozen R1 hashes, checked local links and whitespace. No implementation, production change, new runtime test or accepted outcome. This cycle's alternatives and documentation remain uncommitted.

— Codex · 2026-10-30 UTC

2026-11-01 UTC — Step 1 current-code review

Necessary/useful instructions

  • Source: step1_solution_assessment.md, Review and revision. Contribution: revisiting relevance updates the existing assessment without interpreting the question as Step 1 approval or starting implementation. Suggestion: retain.

  • Source: RAILSPIKE.md, Experimental Effort Estimation. Contribution: retains the original baseline and exposed estimates while recording the current reviewed revision and verified frozen references. Suggestion: retain.

Redundant/unnecessary instructions

  • No supported findings.

Verification: Read current approval policy/rebuild, authentication/session forwarding, signed-post identity resolution and bounded history service/revision paths. Corrected the moved sync-plan link. Reviewed changes from original baseline; no runtime tests or implementation. All three R1 hashes match the ledger. Scope and estimates reaffirmed; authority, historical eligibility and reactivation remain design decisions. Dependency delta zero; planning remains uncommitted.

— Codex · 2026-11-01 UTC

2026-11-01 UTC — Step 1 operator expansion

Necessary/useful instructions

  • Source: step1_solution_assessment.md, Review and revision. Contribution: incorporates explicit operator-retirement direction while preserving the Step 1 gate and original query. Suggestion: retain.

  • Source: RAILSPIKE.md, Experimental Effort Estimation. Contribution: versions expanded authority as v2/A and retains the original 0.95 projection beside the new 1.00 projection. Suggestion: retain.

Redundant/unnecessary instructions

  • No supported findings.

Verification: Revised Option A, permissions, replacement sequence and acceptance coverage; retained independent approval-flag semantics and final-key protection for operators. Checked planning whitespace. No application changes, runtime tests or dependency changes; Step 1 remains unapproved.

— Codex · 2026-11-01 UTC

2026-11-01 UTC — Step 2

Necessary/useful instructions

  • Source: step2_feature_description.md, completion boundary and shared component inventory. Contribution: turns operator/member permission scope into normal Account and Users/Access journeys and identifies status consumers beyond the retirement button. Suggestion: retain.

  • Source: RAILSPIKE.md, approval and snapshot contracts. Contribution: records explicit Step 1 approval while presenting the final-retirement policy for Step 2 review and retaining v2/A history. Suggestion: retain.

Redundant/unnecessary instructions

  • No supported findings.

Uncertain assessments

  • Source: step2_feature_description.md, one-page target. Required shared surface inventory, authority/history risks and study fields exceed one page for this coupled feature. Kept five core requirements and grouped existing surfaces; no implementation design added.

Verification: Inspected Account and User Access templates and existing identity/approval API surfaces; checked document links (future Step 3/4 navigation intentionally pending) and whitespace. No runtime, browser, deployment or dependency changes. Whole-cycle 1.00 reaffirmed; Step 2 and implementation remain unapproved.

— Codex · 2026-11-01 UTC

2026-11-01 UTC — Step 3

Necessary/useful instructions

  • Source: step3_development_plan_do.md, Key Risks and dependency gates. Contribution: puts active/historical eligibility, timestamp-free legacy transfers, acceptance serialization and replay before a writable retirement route. Suggestion: retain.

  • Source: step3_development_plan_after.md, planning commit/approval boundary. Contribution: keeps these plans uncommitted and preserves unrelated sibling drafts for the later feature-branch setup. Suggestion: retain.

  • Source: RAILSPIKE.md, original stage estimates and attribution. Contribution: records eight stable stage estimates separately from the independently reaffirmed cycle estimate, with one whole-plan footer. Suggestion: retain.

Redundant/unnecessary instructions

  • No supported findings.

Uncertain assessments

  • Source: Step 3 one-page target alongside mandatory per-stage fields. This plan exceeds one page to retain required eight-stage contracts, historical-access gates and recovery evidence; it does not claim compliance with the length target. Suggestion: separate a concise review overview from required execution detail.

  • Source: Step 3 stage sizing. Eight stages target bounded work using existing components, but Stage 1 must validate evidence/serialization feasibility before dependent work. Actual stage sizing must be revisited before implementation; no timed execution or measured labor supports the estimates.

Verification: Reviewed current approval acceptance, canonical write serialization, message transfer/receipt storage and ordinary key-management entry points. Read retraction coordination before planning reuse of ordinary serialization; no retraction guards/diagnostics proposed. Checked all eight stage fields, single footer, current document targets, frozen R1 hashes and whitespace. No runtime tests, application changes, dependency changes, commits or deployment. Step 2 approved; Step 3 awaits approval.

— Codex · 2026-11-01 UTC

2026-11-01 UTC — Stage 1 gate disposition

Source: Approved Step 3, Stage 1 and Key Risks; step4_implementation_do.md, material risk before dependent work. Actual finding: signed rename plus retained approval does not establish same-account retirement authority; missing legacy context prevents silently treating all existing same-name keys as proven members. Saved a real-key characterization and reviewable Step 2 coverage proposal. Stage 1 incomplete; Stages 2–8 not started. This is a stage note, not a completed Step 4 diagnostic report. Dependency delta zero.

— Codex · 2026-11-01 UTC

2026-11-01 UTC — Revised Steps 2–3, disabled-rename direction

Necessary/useful instructions

  • Source: step1_solution_assessment.md, Review and revision; step3_development_plan_before.md, reconcile approved scope. Contribution: replaces the earlier unselected account-association proposal in the actual requirements rather than leaving the user direction only as an appendix. Suggestion: retain.

  • Source: step3_development_plan_after.md, revised execution approval. Contribution: presents concrete effective-flag/history/bootstrap and replacement guards before dependent implementation. Prior approvals, branch and characterization remain intact; no restart.

Redundant/unnecessary instructions

  • No supported findings.

Verification: Step 2 v3/A approved by user; revised Step 3 pending. Document links/whitespace and exact frozen R1 hashes checked. No new runtime test, implementation or dependency change. Whole-cycle 1.00 reaffirmed; S1 whole-stage projection revised from retained 0.15 to 0.20 for the characterization plus new bounded guard work; other stage values preserved. Existing eight-stage plan remains, with affected stage edits attributed as one scope revision.

— Codex · 2026-11-01 UTC

2026-11-02 UTC — Completed Step 4

Necessary/useful instructions

  • Source: step4_implementation_do.md, stage dependency and recovery gates. Contribution: real restore and private-message journeys exposed the archive root/classification gap and the reader's shared active-key lookup; both fixed before closeout. Retain normal-flow recovery requirements.

  • Source: step4_implementation_after.md, baseline distinctions and log-only handoff. Contribution: full suite disclosed one introduced label regression, now fixed; the other eight failing tests were reproduced on unchanged main. Isolated static-release assertion differs from its earlier full-suite context failure and is explicitly recorded. Retain.

  • Source: project CONTRIBUTING.md and AGENTS.md, viewer state before paint and theme checks. Contribution: eligible actor hints and shared markup were verified across six roles and 16 themes, including a lost accepted response and exact retry. Retain.

  • Source: standing effort study P2, revision and incomplete outcomes. Contribution: original estimates and authority gate preserved; discovered Stage 7 work raised projection to 1.05 without inventing elapsed labor or maintainer acceptance. Retain.

Redundant/unnecessary instructions

  • No supported findings.

Uncertain assessments

  • Eight stage artifacts plus repeated verification summaries create substantial documentation for this feature. They made authority and restore boundaries reviewable, but future cycles above 1.00 should discuss splitting earlier; required recovery must remain part of the parent outcome.

Verification: All eight stages have scoped commits with summary updates; initial planning precedes implementation. Final stage 9a3d10a9e includes release evidence, final retrospective and current-cycle ledger closeout. Full suite 1754/1763 before final corrections; introduced approval label fixed, 12 final focused checks pass, eight remaining failing tests reproduce on unchanged main. Browser member/operator and private-history recovery, real CLI archive/rebuild, private-store restore and concurrent acceptance evidence in acceptance.txt. Syntax, whitespace and concept source links pass. No dependencies, production changes, push or merge. Unrelated sibling drafts/ledger additions preserved. Temporary clean baseline worktree removed after comparison. Maintainer fit/acceptance pending; no measured labor or accepted-count increment. Debug mode restored to inherited enabled state; no configuration changed. This is the separate log-only handoff commit.

— Codex · 2026-11-02 UTC